How much do I need? Is the coverage the same for all coats?

Theoretical coverage is approximately 300-400 ft²/gal/coat depending on the method of application and the porosity. Generally on a concrete surface, the first coat will take the most coating as it seeps into the pores of the concrete. The second and subsequent coats will take less.