A Rust Bullet topcoat should be applied within the standard recoat times of two to six hours. If 12 or more hours have lapsed, wait for Rust Bullet to harden for at least 24 hours then lightly scuff with 80-100 grit sandpaper; enough to break the glaze to create a surface profile.

If a spray application of Rust Bullet has been accelerated by adding Rust Bullet Rapid Fire Accelerator, a topcoat may be applied approximately one hour after the final coat of the accelerated Rust Bullet coating has been applied.

If you plan to apply a premium finishing paint or any topcoat other than Rust Bullet, it is important to ensure compatibility and follow the application guidelines provided by the topcoat manufacturer. In most cases, Rust Bullet must be allowed to fully cure, typically 24 to 48 hours, before any additional coatings are applied. This curing period allows the coating to harden sufficiently so it can be properly sanded and prepared for adhesion.

Once fully cured, the Rust Bullet surface must be mechanically abraded using 80–100 grit sandpaper. This process breaks the glossy finish and creates a surface profile necessary for optimal adhesion of the topcoat. After sanding, thoroughly clean the surface to remove all dust, debris, and any potential contaminants. Use a clean, lint-free cloth and Rust Bullet Solvent to wipe clean the surface. Ensure the surface is completely clean and dry before proceeding with application.

Because different topcoats may have unique chemical compositions and bonding requirements, always consult the manufacturer of the finishing product to confirm compatibility and proper surface preparation. Skipping these steps may lead to adhesion issues, premature coating failure, or voided warranties.

whats what’s additional coats

Did you find this FAQ helpful?
Thumbs Up Icon 0
Thumbs Down Icon 0

Categories:

Tags:

Comments are closed

Contact Us

USA 1-800-245-1600
CANADA 1-800-789-3993

Support@RustBullet.com